Energising
First hall energises 15 October 2026

The next gigawatt of AI compute is being built in India.

Podport delivers AI-ready capacity to the world's compute buyers: land, power, capital and operations, engineered for 230 kW racks and run to an SLA under one contract.

220 kVSubstation on site
230 kWPer rack, liquid-cooled
37 MWDeliverable by mid-2027
~600 MWPipeline behind it
Demand

The world needs compute. It needs somewhere to plug it in.

Labs, neoclouds and hyperscalers are short of powered, liquid-cooled halls, not GPUs. India has land, grid and engineering depth at a scale few markets can match. We connect the two.

Capacity
0 MW
Live, contracted and pipeline, to March 2028
15 Oct 2026West metro, air-cooled3 MWEnergising
Q1 2027West metro, air-cooled+3 MWContracted
LOI + 9 moWest metro, liquid, 230 kW/rack24 MWContracting
Jul 2027South metro, liquid7 MWContracted
Dec 2027East coast campus100 MWAnchor open
Mar 2028South-central campus500 MWAnchor open
Backing

Capital, land and the people who run hyperscale. On one side of the table.

Capital

One of the world's leading private investment firms, with more than $200 billion under management.

It has built hyperscale data-centre platforms across Asia, including India. It funds the build and, on selected sites, the GPUs.

Land & power

One of India's largest real-estate and infrastructure groups.

Hundreds of megawatts of colocation already operating, substations on site, and a multi-gigawatt build programme across India's core markets.

Build & run

Operators who have built and run hyperscale cloud and data-centre infrastructure.

Designs certified by NVIDIA and Vertiv, direct liquid cooling to 230 kW a rack, and cluster operations to a written SLA.

Ways to buy

One contract. As much of the stack as you want us to carry.

Colocation

Site

You bring and run the GPUs. We deliver a qualified, energised hall on a negotiated lease, with power passed through at actual tariff.

Colocation + operations

Site, ops

You own the GPUs and we keep them alive: physical and cluster operations to a written SLA, for teams without people on the ground in India.

Funded compute

Everything

The GPUs are financed for you. Reserve capacity on a lease or take-or-pay basis and never write the hardware cheque.

Time to power

Build your own and wait years. Or plug in this quarter.

Build your own hall: land, approvals, grid connection, substation, long-lead gear18–36 months
Plug into Podport capacityLive 15 Oct 2026

No $5–7M per MW of facility capex on your balance sheet before a single GPU arrives.

Substation, dual grid feeds, N+1 gensets and 48 hours of fuel already in place.

Move from 30 kW air racks to 230 kW liquid racks without building a new hall.

About us

A small team that puts compute buyers and Indian capacity on one contract.

We bring India's AI-ready data-centre capacity to the world's compute buyers, as one contract with one team accountable for it.

Founders

Your counterparts from first call to energised rack.

  • Sameehanay JahagirdarCo-founder

    Runs applied AI at Powers My Biz, leading AI transformation of core, critical operations for education, healthcare and BFSI enterprises.

  • Uthsav AhujaCo-founder

    Built what was then India’s largest game studio and sold it to Disney. Has since originated and financed over $700 million of growth capital for Indian enterprises.

Advisors

Operators and investors from hyperscale cloud, IT services and capital markets.

  • Amar GowdaAdvisor

    Leads AI strategy at a US hyperscale cloud; ex-Microsoft Azure.

  • Dennis KennetzAdvisor

    ML infrastructure engineer at a US hyperscale cloud; a decade in HPC.

  • Prakash AhujaAdvisor

    Former CEO, Sonata Software and ITC Infotech USA; a founder of NASSCOM; managing partner, Silvertree Capital.

  • U R BhatAdvisor

    Former CEO, Morgan Stanley India; founder, Dalton Capital Advisors (India).

Get in touch

Email the founders directly, or send your cluster plan through the form below and we reply with the halls that fit, under NDA.

The first hall, energising 15 October 2026

West metro campus, built and energised now.

Power
3 MW IT live on 15 October, a further 3 MW in Q1 2027
Cooling
Air-cooled, up to 30 kW a rack
Fits
About 100 racks at 30 kW: air-cooled HGX B200 / B300 and MI350-class servers, storage and network
Liquid
GB300 and Vera Rubin NVL72 racks go in the 24 MW liquid hall on the same campus, at up to 230 kW a rack
Resilience
220 kV substation on site, dual grid feeds, N+1 gensets, 48 hours of fuel

Rack counts are indicative and depend on your power per rack and layout.

Next step

Send us your cluster plan.

Platform, megawatts, date. We come back with the halls that fit and indicative terms, under NDA.

Your request opens in your email app, addressed to our team.